Mentec House, Dun Laoghaire, Ireland

Back-to-back retaining walls to support footbridge and walkway

Lock + Load
Retaining wall
Author

Kenneth Knox

Published

August 1, 2022

I managed the delivery of the retaining structures for the footbridge walkway in consultation with the project team, from preliminary to final design, inspection and certification. This included a site visit during September 2022 to inspect the wall construction.

Drainage installation

Drainage installation

Placing geogrid

Placing geogrid